Project Name: CEP Phase 9 HTW Interconnect
Location: Fort Gordon, GA
Contract Amount: $7.7M
Size: Not Applicable
CCCI PN: 383
Owner: U.S. Army Corps of Engineers
Design Professional: Stanley Consultants
Project Description: Copper Construction Company, Inc. (CCCI) served as a turn-key subcontractor on this underground piping project. CCCI performed the erosion control, new concrete trenching, trench pipe supports, HTW piping in trench, excavation, HTW underground class A piping, and concrete valve vaults. CCCI worked closely with the Owner/Prime Contractor to schedule outages and road closures to minimize impact to the user. CCCI worked with local suppliers and used local labor as much as possible to ensure that the work on this project helped to contribute to the local economy. CCCI self-performed all phases of work on this project from trench installation to the piping including the fabrication of the custom pipe supports.