Central Energy Plant Modernization
Central Energy Plant Modernization
Appling Middle School Renovation
Appling Middle School Renovation
Repair/Renovation BUP Building 28425 & 28411
Repair/Renovation BUP Building 28425 & 28411
Auditorium Gymnasium Renovation
Auditorium Gymnasium Renovation
Repair/Renovate BUP Buildings 28417 & 28426
Repair/Renovate BUP Buildings 28417 & 28426
Construct CW Distribution System Phases 8 & 9
Construct CW Distribution System Phases 8 & 9
Chilled Water Distribution System Phase 7
Chilled Water Distribution System Phase 7
Repair Barracks BUP Building 28413
Repair Barracks BUP Building 28413
Georgia Veterans Memorial Cemetery
Georgia Veterans Memorial Cemetery
Infrastructure Utilities Corridor
Infrastructure Utilities Corridor
A.R. Johnson Auditorium Renovation
A.R. Johnson Auditorium Renovation
Construction Of BUP Building 25425
Construction Of BUP Building 25425
Mount Vernon Bank
Mount Vernon Bank
Allied Health Building
Allied Health Building
CEP Phase 9 HTW Interconnect
CEP Phase 9 HTW Interconnect
Mobilization Support Facility
Mobilization Support Facility
Upgrade Energy Plant Distribution System
Upgrade Energy Plant Distribution System
BUP-Barracks Upgrade Buildings
BUP-Barracks Upgrade Buildings
Repair Indoor Pool HVAC
Repair Indoor Pool HVAC
VIdalia Municipal Annex
VIdalia Municipal Annex
Repair TBUP Dining Facility
Repair TBUP Dining Facility
SCIF Facility Additions
SCIF Facility Additions
CEP Piping Distribution - B310
CEP Piping Distribution - B310
Lakeside High School – HVAC, Ceilings, & Lights Replacement
Lakeside High School – HVAC, Ceilings, & Lights Replacement
Atlanta Combined Heat & Power Plant and New Steam Generation System
Atlanta Combined Heat & Power Plant and New Steam Generation System
Upgrades to Buildings 21715 & 21716
Upgrades to Buildings 21715 & 21716
FY15 81st Florence SC Resets
FY15 81st Florence SC Resets
Building 399 Roof Renovations
Building 399 Roof Renovations
FY15 81st Morehead City NC Resets
FY15 81st Morehead City NC Resets
Design Construction Gate 1 VCC
Design Construction Gate 1 VCC
Replace Failed CW & HW Insulation
Replace Failed CW & HW Insulation
Chiller & Cooling Tower Replacement
Chiller & Cooling Tower Replacement
Chiller Boiler Replacement
Chiller Boiler Replacement
Chiller #1 & #2 Replacement
Chiller #1 & #2 Replacement
Repair/Replace Steam Lines
Repair/Replace Steam Lines
Trane Facility Repairs
Trane Facility Repairs
Roof and Related Repairs to AACOA
Roof and Related Repairs to AACOA
Lakeside Middle School – HVAC, Ceilings, & Lights Replacement
Lakeside Middle School – HVAC, Ceilings, & Lights Replacement
Riverside Middle School – HVAC, Ceilings, & Lights
Riverside Middle School – HVAC, Ceilings, & Lights
B34500 Replace 600kw Generator
B34500 Replace 600kw Generator
B310 Chiller Replacement
B310 Chiller Replacement