Upgrade Energy Plant Distribution System

Project Name:              Upgrade Energy Plant Distribution System

Location:                      Medical College of Georgia – Augusta, GA

Contract Amount:        $3.6M

Size:                               Not Applicable

CCCI PN:                       392

 

Owner:                           Medical College of Georgia

Design Professional:   CUH2A, Inc.

 

Project Description: Copper Construction Company, Inc. (CCCI) served as the prime contractor on this underground piping project.  Work included the removal of asphalt and sidewalks, the installation of new class A high temperature water supply and return, new sidewalks, and asphalt repairs.